Proposed Solar Development
The locations of the proposed solar array, and all other proposed infrastructure will be informed by rigorous site investigations and assessments carried out over the last two years.
This includes:
Ecological surveys
Ornithological surveys
Hydrological and geological site investigations
Flood modelling
Archaeological surveys
Glint and Glare surveys and modelling
Noise modelling
Landscape and visual assessment
Planning and Environmental Report (PER)
The planning application for the proposed development will be accompanied by a PER. The PER is a detailed environmental report, which forms part of the planning application, and assesses the potential effects of the solar farm under headings such as:
Population & Human Health
Biodiversity
Soils & Geology
Water
Noise & Vibration
Air Quality & Climate
Landscape & Visual
Traffic & Transportation
Culture & Heritage
Planning
A planning application is expected to be lodged with Cork County Council in December 2026